•  Home   •  About RWD   •  My Account   •  Contact Us
Russ Wernimont Designs
CART IS EMPTY
  » New Products
  » Products
     - Accessories
     - Dashes
     - Fenders
     - Gas Tanks
     - Lighting
     - Mirrors
     - Saddlebags/Lids
     - Seats
     - Suspensions
  » Conversion Kits
     - Bagger
     - Softail
  » RWD Racing
  » R/C Racing & Parts
  » Bikes & Babes Gallery
  » Close out specials
Front 26
RWD-50110 Front 26" wrap fender
REAR 9
RWD-50109 REAR 9" FL FENDER W/EXTENSION W/TAILIGHT
RWD-50071C OVAL MIRROR SET WITH CONVEX LENS
RWD-50071C RWD-50071C OVAL MIRROR SET WITH CONVEX LENS
Home > Conversion Kits > Bagger > Gas Tanks > Road Glide

0701-0318 GAS TANK 3" INJ 03-07 RG (17.5"W)

Part Number 0701-0318
0701-0318 GAS TANK 3" INJ 03-07 RG (17.5"W)
Email a friend Email a friend
Review this item Review this item
Price
Your Price:  
$1,186.95
Quantity
Description

3" stretch direct bolt on tank for 03-07 Fuel Injected, or 96-06 Carbureted Road Glides, Electra Glides or Street Glides, One piece tanks feature a curved bottom for a custom look. Includes raw dash panel that replaces the existing dash. Any aftermarket cap will fit. We recommend Drag Specialties PN 0703-0060.
Accepts the stock O.E.M. fuel-pump assembly and uses a L96-07 vented gas cap. Carbureted tanks include a filler plate/neck assembly and use a L96-07 vented gas cap.

These tanks come powder-coated on the inside to ensure a clean sealed surface. There is no need to etch or use any other sealer. Minimal prep work will be needed prior to paint. Requires stock seat modification.

Tanks fit with RWD Profile (PN 0804-0247) and Protour (PN 0804-0248) Seats, sold separately.

Made in the USA using 14 and 16 guage steel. Tig welded by an American Craftsman.

Our Road Glide, Road King, Street Glide, and Electra Glide tanks come standard with one fuel outlet.  If two outlets are needed, please special order your tank.

 

WARNING: All tanks are shipped unpainted. All gas tanks should be fitted, pressure-tested and sealed BEFORE being painted to eliminate potential problems.

Note: Lead time on these tanks can be up to 4-6 weeks.

NOTE: Filler plate on carb tanks may require modifications to reinstall early-style sending unit.